Skip to content
Coquina Environmental

For builders, developers and designers

The test between the end of construction and the day someone moves in. You hand over a documented clean building, with a clearance certificate for the project file, and on larger projects a moisture sign-off at each stage before the walls close.

Book a clearance

Where to start: Clearance TestingFrom $650 per unit

A specialist takes a moisture reading on exposed framing in a house under construction near the coast.

What you get

  1. 01

    A documented clean building

    VOC and formaldehyde, construction dust, moisture, an HVAC commissioning check and water, tested before occupancy.
  2. 02

    A certificate for the file

    A clearance certificate and report, and a re-test at a reduced rate if any item fails.
  3. 03

    Water caught before it is closed in

    Moisture monitoring of the envelope and slab at framing, dry-in and pre-drywall, with a sign-off at each stage.
  4. 04

    Materials chosen before the work

    A renovation review of materials, finishes and scope, with a low-emission substitution list.

A project, start to handover

  1. 01

    Renovation review of materials and finishes before work starts.

  2. 02

    Moisture sign-off at framing.

  3. 03

    Moisture sign-off at dry-in.

  4. 04

    Moisture sign-off before drywall.

  5. 05

    Clearance testing and certificate before occupancy.