For builders, developers and designers
The test between the end of construction and the day someone moves in. You hand over a documented clean building, with a clearance certificate for the project file, and on larger projects a moisture sign-off at each stage before the walls close.
Book a clearance
Where to start: Clearance TestingFrom $650 per unit

What you get
- 01
A documented clean building
VOC and formaldehyde, construction dust, moisture, an HVAC commissioning check and water, tested before occupancy. - 02
A certificate for the file
A clearance certificate and report, and a re-test at a reduced rate if any item fails. - 03
Water caught before it is closed in
Moisture monitoring of the envelope and slab at framing, dry-in and pre-drywall, with a sign-off at each stage. - 04
Materials chosen before the work
A renovation review of materials, finishes and scope, with a low-emission substitution list.
The services you would use
In the order they are usually taken.
A project, start to handover
- 01
Renovation review of materials and finishes before work starts.
- 02
Moisture sign-off at framing.
- 03
Moisture sign-off at dry-in.
- 04
Moisture sign-off before drywall.
- 05
Clearance testing and certificate before occupancy.